Secondary Lining Tolley for Construction

Product Details
Customization: Available
Certification: ISO, ROHS, CE
Material: Steel

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (18)
  • Secondary Lining Tolley for Construction
  • Secondary Lining Tolley for Construction
  • Secondary Lining Tolley for Construction
  • Secondary Lining Tolley for Construction
  • Secondary Lining Tolley for Construction
  • Secondary Lining Tolley for Construction
Find Similar Products

Basic Info.

Surface Treatment
Painted
Thickness
Customized
Size
Customized
Transport Package
Standard Export Package
Specification
1M, 1.1M, 1.2M, 1.3M, 1.4M, 1.5M, 1.6M, 1.8M, 2M
Trademark
Xunkun
Origin
Cangzhou
HS Code
8480600000
Production Capacity
10 Set Per Year

Product Description

 

Product Description
Secondary Lining Tolley for ConstructionSecondary Lining Tolley for ConstructionSecondary Lining Tolley for Construction
 
Secondary lining, the process of installing a protective layer of concrete or other materials onto the primary support structure of a tunnel, is crucial for maintaining structural integrity, preventing water ingress, and ensuring the long-term stability and safety of the tunnel. 

It is equipped with advanced features such as adjustable frame system, concrete injection mechanism and precision control system, which greatly reduces manual labor and minimizes human error.



Direct Benefits to the Industry


Efficiency Boost: 
Secondary lining trolleys significantly increase the speed of lining installation. By automating the process, they eliminate the need for extensive scaffolding and manual placement of materials, allowing for continuous and uninterrupted work cycles. This not only reduces project timelines but also lowers operational costs associated with labor and downtime.
Improved Quality Control: 
Precision control systems ensure that the lining is applied evenly and to the exact specifications required. This eliminates the inconsistencies that can occur with manual methods, resulting in a more durable and uniform finish that meets or exceeds engineering standards.
Enhanced Safety:
 By minimizing the need for workers to enter the tunnel's confined spaces during the lining process, secondary lining trolleys significantly reduce the risk of accidents and injuries. The machines operate from a safer distance, allowing workers to monitor and control operations remotely, ensuring their wellbeing.



Direct Benefits to the works
Reduced Physical Strain:
 The automation of heavy lifting and placement tasks alleviates the physical demands on workers, reducing fatigue and the risk of workplace injuries related to manual handling.
Better Working Conditions: 
With less reliance on manual labor, workers are exposed to fewer dust particles and other hazards associated with concrete work. 
This improves their overall health and well-being while working in enclosed environments.


 


Company Profile
Secondary Lining Tolley for Construction
Hebei Xunkun Trading Co., Ltd.                                          Road and bridge equipment innovation pillar


Since its founding 20 years ago, our company has transformed itself into a comprehensive and powerful company in the industry, offering seamlessly integrated R&D, manufacturing, sales, leasing, buyback and modification services   


Kaichuangxing understands the complex needs of the infrastructure industry and has carefully designed a diverse portfolio of construction products to meet the needs of a variety of projects. From advanced road and bridge construction equipment to innovative materials and solutions, the company's products cover the entire spectrum of infrastructure development.



FAQ
Q1:Are you trading company or manufacturer?
A:We are a factory, and we have rich experience in field of international trading.

Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.

Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.

Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier