Versatile Tunnel Arch Trestle Bridge Trolley Reliable Inverted Arch Trestle System
Negotiable | 1 Set (MOQ) |
Min. Order:
1 Set
Port:
Tianjin, China
Production Capacity:
10 Set Per Year
Payment Terms:
T/T
Hebei Xunkun Trading Co., Ltd.
Hebei, China
Last Login Date:
Feb 10, 2025
Business Type:
Manufacturer/Factory
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
After-sales Service
Provided
Warranty
Provided
Certification
ISO, ROHS, CE
Material
Color
Surface Treatment
Painted
Thickness
Size
Trademark
Xunkun
Transport Package
Standard Export Package
Specification
1M, 1.1M, 1.2M, 1.3M, 1.4M, 1.5M, 1.6M, 1.8M, 2M
Origin
Cangzhou
HS Code
8480600000
Product Description
Product Name | Self-propelled invert trestle |
Usage | Bridges and Tunnels Construction |
Materials | Q235 Steel |
Thickness | Customized |
Technical Support | Remote or On-Site Instruction |
Steel Formworks are applied in Bridge of highway, railway projects widely. Our formwork porudcts with stable, high quality, easy to operate and use and at a pretty high reuse rate. Make sure the project more smooth and swift.
Our Advantages
Company Profile
Hebei Xunkun Trading Co., Ltd. is located in Cangzhou City, Hebei Province, China, and has 20 years of experience in the production of steel formwork. Our steel formwork is mainly used in bridge and tunnel construction. We serve many large enterprises in China, such as China Railway Company, China Construction Investment Corporation, etc., and are working hard to develop overseas markets in the world. We look forward to friendly and smooth communication with our customers.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a factory, and we have rich experience in field of international trading.
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
Send your message to this supplier
People who liked this also liked