Simple Structure T Beam Girder Steel Formwork Beam Simple Structure
US$1,040.00 - 1,050.00 | 1 Ton (MOQ) |
Port:
Tianjin, China
Production Capacity:
20000 Tons Per Year
Payment Terms:
T/T
Hebei Xunkun Trading Co., Ltd.
Hebei, China
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
KCX T3
After-sales Service
Provided
Warranty
1 Year
Certification
ISO, ROHS, CE
Material
Steel
Type
Beam Formwork
Color
Customized
Surface Treatment
Painted
Thickness
Customized
Size
Customized
Trademark
Xunkun
Transport Package
Standard Export Package
Specification
Customized
Origin
Cangzhou
HS Code
8480600000
Product Description
Product Name | Steel Formwork |
Usage | Bridges and Tunnels Construction |
Materials | Q235 Steel |
Thickness | Customized |
Technical Support | Remote or On-Site Instruction |
Steel Formworks are applied in Bridge of highway, railway projects widely. Our formwork porudcts with stable, high quality, easy to operate and use and at a pretty high reuse rate. Make sure the project more smooth and swift.
Our Advantages
- Light weight: Our Steel Formworks are more light.
- Simple structure: Our Steel Formworks are mainly made up of steel frame formwork, sealing board, out corner, inner corner, tension bar, wedge, hook, steel pipe and so on. These simple parts could be assembled for wall, column, slab and beam together.
- Reusable: Our Steel Formworks could be used no less than 150 times without damage,lot times turnover means cost saving.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a factory, and we have rich experience in field of international trading.
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
Send your message to this supplier
People who liked this also liked