Low-Cost Railway Tunnel Concrete Lining Trolley

Product Details
Customization: Available
After-sales Service: Provided
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (18)
  • Low-Cost Railway Tunnel Concrete Lining Trolley
  • Low-Cost Railway Tunnel Concrete Lining Trolley
  • Low-Cost Railway Tunnel Concrete Lining Trolley
  • Low-Cost Railway Tunnel Concrete Lining Trolley
Find Similar Products

Basic Info.

Certification
ISO, ROHS, CE
Material
Steel
Transport Package
Standard Export Package
Trademark
Kaichuangxing
Origin
China
HS Code
8480600000

Product Description

Secondary Lining Trolley 
Product Description
Tunnel Lining Trolley
The concrete lining steel formwork trolley is a non-standard product specially designed and manufactured by our company according to the user's engineering requirements, This product as an indispensable special construction equipment for the secondary lining of the current tunnel drilling and blasting method. The use of lining trolleys can be used greatly improve the efficiency of construction and improve the surface quality of the secondary lining of the tunnel. The lining trolley is manufactured by our company with full-hydraulic de-mold and electric reducer to automatically walking. The types of lining trolleys of our company are: railway trolley, highway trolley full-needle beam trolley, spillway tunnel trolley, subway trolley, and integrated tube trolley
Low-Cost Railway Tunnel Concrete Lining Trolley

 
FAQ
Q1:Are you trading company or manufacturer?
A:We are a factory, and we have rich experience in field of international trading.

Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.

Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.

Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier