Sturdy Hanging Basket for Efficient Construction Equipment Management

Product Details
Customization: Available
Certification: ISO, ROHS, CE
Material: Steel

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (18)
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
  • Sturdy Hanging Basket for Efficient Construction Equipment Management
Find Similar Products

Basic Info.

Transport Package
Standard Export Package
Specification
1M, 1.1M, 1.2M, 1.3M, 1.4M, 1.5M, 1.6M, 1.8M, 2M
Trademark
Xunkun
Origin
Cangzhou
HS Code
8480600000
Production Capacity
10 Set Per Year

Product Description

 

Product Description

Sturdy Hanging Basket for Efficient Construction Equipment ManagementSturdy Hanging Basket for Efficient Construction Equipment ManagementSturdy Hanging Basket for Efficient Construction Equipment Management
In modern highway construction, precision and efficiency are essential to ensure the safety, durability and timely completion of infrastructure projects. Among the innovative tools for achieving these goals, hanging baskets, or more specifically, moving trolleys or bridge-building machines, have become game changers for pouring concrete segments over long spans. These complex structures not only simplify the construction process, but also greatly improve the quality and speed of bridge deck and overpass construction.

The function of hanging basket in highway construction
Hanging baskets are specially designed platforms that, in the pouring of highway Bridges and overpasses, serve as mobile workshops to precisely pour concrete sections without the need for extensive scaffolding or ground support structures.

Direct Benefits 



Safe passages: They provide a stable and safe platform for workers to perform tasks at altitude, minimizing the risks associated with working at altitude.
Precision pouring: The design of the hanging basket facilitates precise concrete pouring, ensuring that each section is poured to the exact specifications required for structural integrity.
Continuous construction: Since the basket can be moved along the length of the bridge, continuous pouring operations can be achieved, reducing downtime and speeding up overall construction time.
Versatility: Suitable for a variety of bridge designs and geometric shapes, the hanging basket can meet a variety of architectural needs.


Company Profile
Sturdy Hanging Basket for Efficient Construction Equipment Management
Hebei Xunkun Trading Co., Ltd.                                          Road and bridge equipment innovation pillar


Since its founding 20 years ago, our company has transformed itself into a comprehensive and powerful company in the industry, offering seamlessly integrated R&D, manufacturing, sales, leasing, buyback and modification services   


Kaichuangxing understands the complex needs of the infrastructure industry and has carefully designed a diverse portfolio of construction products to meet the needs of a variety of projects. From advanced road and bridge construction equipment to innovative materials and solutions, the company's products cover the entire spectrum of infrastructure development.



FAQ
Q1:Are you trading company or manufacturer?
A:We are a factory, and we have rich experience in field of international trading.

Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.

Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.

Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier